Name of project
|
Client
|
Scope of Work
|
Completion
Date
|
Vehicle Maintenance Facility,
USAG Humphreys, Korea |
FED |
Vehicle Maintenance Facility
|
Aug. 2012 |
|
Road Crossing and CP Work |
ARAMCO |
Piping Work,
Cathdic Protection Work
|
Nov. 2011 |
Installation of Instrument Cable
and Junction Boxes |
ARAMCO |
Instrument Work
- Cabling
- Installation of Junction Box
|
Aug. 2011 |
Replace ESD System of
Sulfur Recovery Units 100&200
at Berri Gas Plant |
ARAMCO |
Installation of ESD System
|
Nov. 2009 |
Replace Taxway Lights and
Cable, Taegu Air Base |
USACCK |
Replace Taxway Lights and cable
|
Sep. 2009 |
Repair all Roll-up Doors
Building Nos S-835, S-836,
and S-840, Camp Carroll |
USACCK |
Repair Roll-up Door
|
Aug. 2009 |
Instaqllation of
6" dia RTR Sanitary Pipe |
ARAMCO |
Piping, Civil Work
|
July. 2009 |
CCK Replace Two each
Underground fuel storage tank
at Camp Walker |
USACCK |
CCK Replace Two each
Underground fuel storage tank
|
May. 2009 |
Replace High Voltage Feeders,
Suwon Air Base, Korea |
USACCK |
Replace High Voltage
Feeders
|
May. 2009 |
Repair/Replace revement at
B#2401 at Osan Air Base |
USACCK |
Repair/Replace revement
at B#2401
|
Dec. 2008 |
Modernization of Bldg.702
Child Development Group Home
at CFA Chinhae, Korea |
NAVFAC |
Modernization of Bldg
|
Nov. 2008 |
Revovate Bldg.723
Distance Learning Room
at CFA Chinhae, Korea |
NAVFAC |
Revovate Bldg.723,
Distance Learning Room
|
Oct. 2008 |
Repair Sewage System
at CFA Chinhae, Korea |
NAVFAC |
Repair of Sewage System
|
Oct. 2008 |
|
Replace ESD System For SRU 1&2 At Berri Gas Plant
|
ARAMCO |
Replace ESD System For SRU 1&2 At Berri Gas Plant
|
Oct. 2008 |
The Project for
Busuanga Airport
Development |
KOICA (Phillipine) |
The Project for
Busuanga Airport
Development
|
Sep. 2008 |
Upgrade Electrical Substation
and Generator for Bldg.412
at CFA Chinhae, Korea |
NAVFAC |
Upgrade of Electrical
Substation and
Generator for Bldg.
|
Jul. 2008 |
|
 |
Ras Laffan Common Cooling Seawater System Phase ll |
Qatar General Pertroleum Corp. |
Ras Laffan Common Cooling Seawater System Phase ll |
Mar. 2008 |
|
Construction of bundle Cleaning Sheds (SFC/400-640/201) (SA-05-24)
|
ARAMCO |
Construction of bundle Cleaning Sheds (SA-05-24)
|
Dec. 2006 |
|
Demolition of old Control Bldg.755 (SFC/400-640/194) (SA-05-25)
|
ARAMCO |
Demolition of old Control Bldg.755 (SA-05-25)
|
Nov. 2006 |
|
Renovation of Bldg.645 & Bldg. 505 (SFC/400-640/200) (SA-05-27)
|
ARAMCO |
Renovation of Bldg.645 & Bldg. 505 (SA-05-27)
|
Nov. 2006 |
Exploratory Excavation for Underground Utilities |
ARAMCO |
Exploratory Excavation for Underground Utilities |
Oct. 2006 |
Additional Fire & Gas Detection Equipment |
ARAMCO |
Additional Fire & Gas Detection Equipment |
Sep. 2006 |
Provide Support to Clean Pipelines in Riyadh Refinery |
ARAMCO |
Provide Support to Clean Pipelines in Riyadh Refinery |
Aug. 2006 |
Replacing Underground Ditch Near Building S-2416 Camp Stanley, DO#16 |
USACCK |
Replacing Underground Ditch Near Building S-2416 Camp Stanley, DO#16 |
Aug. 2006 |
|
 |
Replace High Voltage Feeders A & B Phase 2 Kwangju Air base,DO#15 |
ROKMND |
Replace High Voltage Feeders A & B Phase 2 Kwangju Air base,DO#15 |
Jul. 2006 |
Replace Open Type Transformers, Osan Air base |
USACCK |
Replace Open Type Transformers, Osan Air base |
Aug. 2004 |
|
Replace Carpet with Wooden strip flooring and replace bathrub with shower booth, building4433, Camp Yongsan, DO#18
|
USACCK |
Replace Carpet with Wooden strip flooring and replace bathrub with shower booth, building4433, Camp Yongsan, DO#18
|
Jun. 2006 |
Repair Substation Transfomer & Replace High Voltage A&B Kwangju Air base |
USACCK |
Repair Substation Transfomer & Replace High Voltage A&B Kwangju Air base |
May.2006 |
CY1,ROCKFC MILLWR003108 Upgrade Water Distribution Sys. Phase2,Kunsan Air base |
FED (Far East District Corps of Engineers)
|
New Water Distribution System, Cathodic Protection Sys. and Asbestos Containing Material Removal Works |
May.2006 |
|
Repair Mep-12, service Station, PH1, PH2,Osan Air abse DO#11
|
USACCK |
Repair Mep-12, service Station, PH1, PH2,Osan Air abse
|
Feb. 2004 |
CCK Uijeongbu Fire brigade Building Remodeling Work(Do#12) |
USACCK |
Repair Fire station T-830, Phase1,Cp Red Cloud |
Jun. 2006 |
|
Fireproofing of MOV Power and Control Cable Conduit (SFC/756-200-128) (SA-05-17)
|
ARAMCO |
Fireproofing of MOV Power and Control Cable Conduit (SA-05-17)
|
Apr. 2006 |
Repair Substation Transfomer & Replace High Voltage A&B Kwangju Air base,(Do#10) |
USACCK |
Outdoor Transformer Replacement Work for CCK Kwangju Air base
|
May. 2006 |
|
Outdoor Transformer Replacement Work for O-san Airport
|
USACCK |
Outdoor Transformer Replacement Work for O-san Airport
|
Dec. 2005 |
|
 |
Lighting Equipment Installation for Area 32,(SA-05-018) |
ARAMCO |
Lighting Equipment Installation for Area 32 |
Dec. 2005 |
13.8Kv Swich Gear Demolition Work |
ARAMCO |
13.8Kv Swich Gear Demolition Work |
Dec. 2005 |
|
New Library Construction Work for CCK Kwangju Airport
|
USACCK |
New Library Construction Work for CCK Kwangju Airport
|
Oct. 2005 |
System Adjustment & Modification Work, (SA-05-016) |
ARAMCO |
System Adjustment & Modification Work, (SA-05-016) |
Sep. 2005 |
Demolition& Installation for Swich Gear |
ARAMCO |
Demolition& Installation for Swich Gear |
Sep.2005 |
Elrectric Power Reformation Work for CH2M Kim-hae Airport |
CH2MHILL |
Elrectric Power Reformation Work for CH2M Kim-hae Airport |
Sep. 2005 |
Airfield Lighting Equipment Replacement Work for CCK Hoeng-seong |
USACCK |
Airfield Lighting Equipment Replacement Work for CCK Hoeng-seong |
Sep. 2005 |
|
Control System Replacement (SA-05-017)
|
ARAMCO |
Control System Replacement (SA-05-017)
|
May.2005 |
Repair Work for Electric & instrumentation of Plant(SA-05-09) |
ARAMCO |
Repair Work for Electric & instrumentation of Plant(SA-05-09) |
May.2006 |
|
Cable Laying Work |
ARAMCO |
Cable Laying Work |
May.2006
|
|
 |
Upgrade OILY Water System, Area51 |
ARAMCO |
Upgrade OILY Water System, Area51 |
Dec. 2005 |
Substation No.1 13.8Kv Swich gear Finalize Construction |
ARAMCO |
Substation No.1 13.8Kv Swich gear Finalize Construction |
Aug. 2005 |
|
Electrical Modification Work in Area 34
|
ARAMCO |
Electrical Modification Work in Area 34
|
Jul. 2005 |
|
Modification of
existingDCS/ESD & F&G
systemLPG sphere
|
Saudi ArabianOil Company |
Instrument & Electric |
Aug. 2004 |
CY1, ROCKFC
MILLWR003108 Upgrade Water
Distribution Sys.Phase2,
Kunsan Air Base |
FED(Far East
District, Corps of
Engineers) |
New Water Distribution System, Cathodic Protection Sys. And Asbestos ContainingMaterial
Removal Works |
Nov. 2005 |
Replace Electrical
Switching
Station CH2M HILL reference
280030.30.01.04(Project)
TaskOrder 129, Taegu
|
CH2M(FED) |
Replace Electrical Switching
System |
Aug. 2004 |
132Kv, Over Head
Transmission& Substation
Works
|
King Saud
University. K.S.A
|
Construction of Fiber OPGW
Cable (102Km),Tower 102Sets,
GIS 7Bays Tr 40Mw x 2 Sets)
|
Dec. 2004 |
Replace Taxiway Lights
with
LED,Osan Air Base
|
US Army, CCK
|
Replace Taxiway Lights (100 Sets) |
Jun. 2004 |
Install Back-Up
Generator at DFAC
|
US Army, CCK
|
Construction Bldg. of Generator
withGenerator 200Kw 1 Set
|
May.2004 |
Saudi Electric
&Telecommunication Works
|
STC & SECO
K.S.A
|
Construction of Fiber Optical
Cable(450Km)
|
Feb. 2004 |
|
 |
RWTS Scada
System Upgradation
|
SWCC, K.S.A
|
Construction of Fiber Optical
Cable(465Km)
|
Nov. 2003 |
Construct picnic
pavilion. Camp Hovey
|
US Army, CCK
|
Construct picnic pavilion
|
Oct. 2003 |
Construction of POL
storagefacility, Camp Casey
|
US Army, CCK
|
Construction of POL
storage facility
|
Sep. 2003 |
220Kv, Installation
Optic Fiber
Cable of the Over Head
Trans-mission Line(Sharkia
to BerralAbd Substation)
|
E.E.T.C (Egyptian
Electricity
Transmission Co,.)
|
Installation Optic Fiber Cable
of the OverHead
Transmission Line.(672Km)
|
July.2003 |
Construct Admin. Bldg
forexercise, Camp Casey
|
US Army, CCK
|
Construct Admin. Bldg
for exercise
|
Apr. 2003 |
Construct 33PN swing
space,Camp Greaves
|
US Army, CCK
|
Construct 33PN swing space
|
Jun. 2003 |
Replace PSP Helipad
w /
concretepad, Camp Bonifas
|
US Army, CCK
|
Replace PSP Helipad
w / concrete pad
|
May. 2002 |
|
Construct perating/Control
Bldg for Water Plant,
Camp Market
|
US Army, CCK
|
Renovate of System
for
Electric Equipment
associated Mechanical R/M
|
Apr. 2003 |
Upgrade Street Lighting
|
US Army, CCK
|
Installation & Renovate of
Street Lighting forCamp Area
|
Apr. 2003 |
Improve Lighting System
in Rail,Camp Market
|
US Army, CCK
|
Improve of System for Lighting
on the Workway beside rail road
|
Apr. 2003 |
|
 |
Repair of Transformers
OpenType (III), O-SAN Air
base
|
US Army, CCK
|
Replacement of HV- Cables
& Pad mountedTransformers
and associated Civil Works
|
Feb. 2002 |
Replace Airfield Approach
Lighting System, O-SAN
Air base
|
US Army, CCK
|
Replacement of AFL,
Transformers, Cablesand
construct U/G Duct-bank,
and associatedCivil Works
|
July. 2001 |
Replace Airfield Lighting
Vault, O-SAN Air base
|
US Army, CCK
|
Installation of New Air Traffic
Control &Monitoring System
|
May. 2001 |
Repair of Transformers
Open
Type (II), O-SAN Air base
|
US Army, CCK
|
Replacement of Transformers,
HV- Cablesand associated Civil
Works
|
Jun. 2001 |
Signal Center &
School(Electricity Part)
|
TAIF, K.S.A
|
Electric Works for Office
& School buildings
|
Dec. 1985 |
Supporting facilities
& housing
in KAMA (Family Housing
63 Units) |
TAIF, KSA |
Electric Works for
Housing compound |
Apr. 1984 |
| Peace SUN (II) Housing |
TAIF, KSA |
Electric Works for
housing compound |
Feb. 1983 |
| SAUDI MSS KASSIM Project |
KASSIM, KSA |
Electrical Works for
Housing compound |
Nov. 1985 |
|
|
|
|
|
|
|