HOME OVERSEAS BUSINESS ACCOMPLISHMENT
Name of project
Client
Scope of Work
Completion
Date
FY09 MCA,PN-5666
Vehicle Maintenance Facility,
USAG Humphreys, Korea
FED

Vehicle Maintenance Facility

April. 2012
Road Crossing and CP Work ARAMCO

Piping Work,
Cathdic Protection Work

Nov. 2011
Installation of Instrument Cable
and Junction Boxes
ARAMCO

Instrument Work
- Cabling
- Installation of Junction Box

Aug. 2011
Replace ESD System of
Sulfur Recovery Units 100&200
at Berri Gas Plant
ARAMCO

Installation of ESD System

Nov. 2009
Replace Taxway Lights and
Cable, Taegu Air Base
USACCK

Replace Taxway Lights and cable

Sep. 2009
Repair all Roll-up Doors
Building Nos S-835, S-836,
and S-840, Camp Carroll
USACCK

Repair Roll-up Door

Aug. 2009
Instaqllation of
6" dia RTR Sanitary Pipe
ARAMCO

Piping, Civil Work

July. 2009
CCK Replace Two each
Underground fuel storage tank
at Camp Walker
USACCK

CCK Replace Two each
Underground fuel storage tank

May. 2009
Replace High Voltage Feeders,
Suwon Air Base, Korea
USACCK

Replace High Voltage
Feeders

May. 2009
Repair/Replace revement at
B#2401 at Osan Air Base
USACCK

Repair/Replace revement
at B#2401

Dec. 2008
Modernization of Bldg.702
Child Development Group Home
at CFA Chinhae, Korea
NAVFAC

Modernization of Bldg

Nov. 2008
Revovate Bldg.723
Distance Learning Room
at CFA Chinhae, Korea
NAVFAC

Revovate Bldg.723,
Distance Learning Room

Oct. 2008
Repair Sewage System
at CFA Chinhae, Korea
NAVFAC

Repair of Sewage System

Oct. 2008

Replace ESD System
For SRU 1&2
At Berri Gas Plant

ARAMCO

Replace ESD System
For SRU 1&2
At Berri Gas Plant

Oct. 2008
The Project for
Busuanga Airport
Development
KOICA
(Phillipine)

The Project for
Busuanga Airport
Development

Sep. 2008
Upgrade Electrical Substation
and Generator for Bldg.412
at CFA Chinhae, Korea
NAVFAC

Upgrade of Electrical
Substation and
Generator for Bldg.

Jul. 2008
Ras Laffan Common
Cooling Seawater
System Phase ll
Qatar General
Pertroleum
Corp.
Ras Laffan Common
Cooling Seawater
System Phase ll
Mar. 2008

Construction of bundle
Cleaning Sheds
(SFC/400-640/201)
(SA-05-24)

ARAMCO

Construction of bundle
Cleaning Sheds
(SA-05-24)

Dec. 2006

Demolition of old
Control Bldg.755
(SFC/400-640/194)
(SA-05-25)

ARAMCO

Demolition of old
Control Bldg.755
(SA-05-25)

Nov. 2006

Renovation of Bldg.645
& Bldg. 505
(SFC/400-640/200)
(SA-05-27)

ARAMCO

Renovation of Bldg.645
& Bldg. 505
(SA-05-27)

Nov. 2006
Exploratory Excavation
for Underground Utilities
ARAMCO Exploratory Excavation
for Underground Utilities
Oct. 2006
Additional Fire & Gas
Detection Equipment
ARAMCO Additional Fire & Gas
Detection Equipment
Sep. 2006
Provide Support to
Clean Pipelines in
Riyadh Refinery
ARAMCO Provide Support to
Clean Pipelines in
Riyadh Refinery
Aug. 2006
Replacing Underground
Ditch Near Building
S-2416
Camp Stanley, DO#16
USACCK Replacing Underground
Ditch Near Building
S-2416
Camp Stanley, DO#16
Aug. 2006
Replace High Voltage
Feeders A & B Phase 2
Kwangju Air base,DO#15
ROKMND Replace High Voltage
Feeders A & B Phase 2
Kwangju Air base,DO#15
Jul. 2006
Replace Open Type
Transformers,
Osan Air base
USACCK Replace Open Type
Transformers,
Osan Air base
Aug. 2004

Replace Carpet with
Wooden strip flooring
and replace bathrub
with shower booth,
building4433,
Camp Yongsan, DO#18

USACCK

Replace Carpet with
Wooden strip flooring
and replace bathrub
with shower booth,
building4433,
Camp Yongsan, DO#18

Jun. 2006
Repair Substation
Transfomer & Replace
High Voltage A&B
Kwangju Air base
USACCK Repair Substation
Transfomer & Replace
High Voltage A&B
Kwangju Air base
May.2006
CY1,ROCKFC
MILLWR003108
Upgrade Water
Distribution Sys.
Phase2,Kunsan
Air base

FED
(Far East District
Corps of
Engineers)

New Water Distribution System,
Cathodic Protection Sys.
and Asbestos Containing
Material Removal Works
May.2006

Repair Mep-12,
service Station, PH1,
PH2,Osan Air abse
DO#11

USACCK

Repair Mep-12,
service Station, PH1,
PH2,Osan Air abse

Feb. 2004
CCK Uijeongbu Fire
brigade Building
Remodeling
Work(Do#12)
USACCK Repair Fire station T-830,
Phase1,Cp Red Cloud
Jun. 2006

Fireproofing of MOV
Power and Control
Cable Conduit
(SFC/756-200-128)
(SA-05-17)

ARAMCO

Fireproofing of MOV
Power and Control
Cable Conduit
(SA-05-17)

Apr. 2006
Repair Substation
Transfomer & Replace
High Voltage A&B
Kwangju Air base,(Do#10)
USACCK

Outdoor Transformer
Replacement Work for
CCK Kwangju Air base

May. 2006

Outdoor Transformer
Replacement Work for
O-san Airport

USACCK

Outdoor Transformer
Replacement Work for
O-san Airport

Dec. 2005
Lighting Equipment
Installation for
Area 32,(SA-05-018)
ARAMCO Lighting Equipment
Installation for Area 32
Dec. 2005
13.8Kv Swich Gear
Demolition Work
ARAMCO 13.8Kv Swich Gear
Demolition Work
Dec. 2005

New Library Construction Work
for CCK Kwangju Airport

USACCK

New Library Construction
Work for CCK
Kwangju Airport

Oct. 2005
System Adjustment &
Modification Work,
(SA-05-016)
ARAMCO System Adjustment &
Modification Work,
(SA-05-016)
Sep. 2005
Demolition& Installation
for Swich Gear
ARAMCO Demolition& Installation
for Swich Gear
Sep.2005
Elrectric Power
Reformation Work
for CH2M Kim-hae Airport
CH2MHILL Elrectric Power
Reformation Work
for CH2M Kim-hae Airport
Sep. 2005
Airfield Lighting Equipment
Replacement Work
for CCK Hoeng-seong
USACCK Airfield Lighting Equipment
Replacement Work
for CCK Hoeng-seong
Sep. 2005

Control System
Replacement
(SA-05-017)

ARAMCO

Control System
Replacement
(SA-05-017)

May.2005
Repair Work for Electric
& instrumentation of
Plant(SA-05-09)
ARAMCO Repair Work for Electric
& instrumentation of
Plant(SA-05-09)
May.2006
Cable Laying Work ARAMCO Cable Laying Work

May.2006

Upgrade OILY Water
System, Area51
ARAMCO Upgrade OILY Water
System, Area51
Dec. 2005
Substation No.1 13.8Kv
Swich gear Finalize
Construction
ARAMCO Substation No.1 13.8Kv
Swich gear Finalize
Construction
Aug. 2005

Electrical Modification
Work in Area 34

ARAMCO

Electrical Modification
Work in Area 34

Jul. 2005

Modification of
existingDCS/ESD & F&G
systemLPG sphere

Saudi ArabianOil Company Instrument & Electric Aug. 2004
CY1, ROCKFC
MILLWR003108 Upgrade Water
Distribution Sys.Phase2,
Kunsan Air Base
FED(Far East
District, Corps of
Engineers)
New Water Distribution
System, Cathodic
Protection Sys.
And Asbestos
ContainingMaterial
Removal Works
Nov. 2005
Replace Electrical Switching
Station CH2M HILL reference
280030.30.01.04(Project)
TaskOrder 129, Taegu
CH2M(FED) Replace Electrical Switching
System
Aug. 2004
132Kv, Over Head
Transmission& Substation
Works
King Saud
University. K.S.A
Construction of Fiber OPGW
Cable (102Km),Tower 102Sets,
GIS 7Bays Tr 40Mw x 2 Sets)
Dec. 2004
Replace Taxiway Lights with
LED,Osan Air Base
US Army, CCK
Replace Taxiway Lights
(100 Sets)
Jun. 2004
Install Back-Up
Generator at DFAC
US Army, CCK
Construction Bldg. of Generator
withGenerator 200Kw 1 Set
May.2004
Saudi Electric
&Telecommunication Works
STC & SECO
K.S.A
Construction of Fiber Optical
Cable(450Km)
Feb. 2004
RWTS Scada
System Upgradation
SWCC, K.S.A
Construction of Fiber Optical
Cable(465Km)
Nov. 2003
Construct picnic
pavilion. Camp Hovey
US Army, CCK
Construct picnic pavilion
Oct. 2003
Construction of POL
storagefacility, Camp Casey
US Army, CCK
Construction of POL
storage facility
Sep. 2003
220Kv, Installation Optic Fiber
Cable of the Over Head
Trans-mission Line(Sharkia
to BerralAbd Substation)
E.E.T.C
(Egyptian
Electricity
Transmission Co,.)
Installation Optic Fiber Cable
of the OverHead
Transmission Line.(672Km)
July.2003
Construct Admin. Bldg
forexercise, Camp Casey
US Army, CCK
Construct Admin. Bldg
for exercise
Apr. 2003
Construct 33PN swing
space,Camp Greaves
US Army, CCK
Construct 33PN swing space
Jun. 2003
Replace PSP Helipad w /
concretepad, Camp Bonifas
US Army, CCK
Replace PSP Helipad
w / concrete pad
May. 2002

Construct perating/Control
Bldg for Water Plant,
Camp Market

US Army, CCK
Renovate of System for
Electric Equipment
associated Mechanical R/M
Apr. 2003
Upgrade Street Lighting
US Army, CCK
Installation & Renovate of
Street Lighting forCamp Area
Apr. 2003
Improve Lighting System
in Rail,Camp Market
US Army, CCK
Improve of System for Lighting
on the Workway beside rail road
Apr. 2003
Repair of Transformers
OpenType (III), O-SAN Air
base
US Army, CCK
Replacement of HV- Cables
& Pad mountedTransformers
and associated Civil Works
Feb. 2002
Replace Airfield Approach
Lighting System, O-SAN
Air base
US Army, CCK
Replacement of AFL,
Transformers, Cablesand
construct U/G Duct-bank,
and associatedCivil Works
July. 2001
Replace Airfield Lighting
Vault, O-SAN Air base
US Army, CCK
Installation of New Air Traffic
Control &Monitoring System
May. 2001
Repair of Transformers Open
Type (II), O-SAN Air base
US Army, CCK
Replacement of Transformers,
HV- Cablesand associated Civil
Works
Jun. 2001
Signal Center &
School(Electricity Part)
TAIF, K.S.A
Electric Works for Office
& School buildings
Dec. 1985
Supporting facilities & housing
in KAMA (Family Housing
63 Units)
TAIF, KSA Electric Works for
Housing compound
Apr. 1984
Peace SUN (II) Housing TAIF, KSA Electric Works for
housing compound
Feb. 1983
SAUDI MSS KASSIM Project KASSIM, KSA Electrical Works for
Housing compound
Nov. 1985